Enter the numbers from your own quote and payroll. Nothing is pre-filled from industry averages except the editable example values below.

Investment

Labor the cell replaces or redeploys

Finance

Payback

—
Labor hours per year
—
Labor savings per year
—
Net savings per year
—
Net over period
—
NPV
—
Return on investment
—

How the calculation works

  • Labor hours per year = operators per shift × shifts per day × hours per shift × working days.
  • Net savings per year = labor hours × burdened labor cost + other savings − running cost.
  • Payback = total cell cost ÷ net savings per year (shown in months).
  • NPV = −cell cost + Σ net savings ÷ (1 + discount rate)year, over the evaluation period.
  • ROI = (net savings × years − cell cost) ÷ cell cost.

Worked example

On the pre-filled example — a $150,000 cell replacing 1 operator on each of 2 shifts (4,000 labor hours per year) at a burdened $30/h, with $6,000/yr running cost — labor savings are $120,000/yr and net savings $114,000/yr, so simple payback is $150,000 ÷ $114,000, or about 16 months. That figure is a screening estimate on these inputs only; it is not a benchmark for other cells — run your own quote and payroll numbers.

What to put in “total cell cost”

The robot arm is often well under half of a working cell. Include the gripper or end-of-arm tooling, guarding or safety scanners, part presentation (fixtures, feeders, conveyors), integration engineering, programming, installation, training and commissioning. Ask your integrator to break these out in the quote — see our robot cell cost breakdown guide for the full seven-bucket RFQ checklist.

Common mistakes

  • Using the wage instead of the burdened cost (wage plus benefits, payroll taxes and overhead).
  • Counting a full operator when the cell still needs someone to load, unload or clear faults part of the time — use fractions such as 0.5.
  • Leaving out the ramp-up period: few cells reach target output in their first weeks.
  • Ignoring tax incentives or depreciation — add them under “other savings” only if your finance team confirms them.

This is a screening estimate, not financial advice. Results depend entirely on your inputs.